20:53 Tuesday, September 09 2007
nice rack
Over the past month or so, I've built out the lab infrastructure significantly, moving 22 systems into 3 42U racks. Each has a remote power switch, and everything is working fine. Unfortunately, I'm only half way done. I've got 8 more systems that need to be racked, plus alot of anticipated growth over the next 3+ months. So now, I've got 3 more racks to build, and then fill up.